Technical Assistance for Heavy Oil Study
Bantrel generated a cost estimate for a 200,000 bbl/day SAGD heavy oil facility, based on minimal engineering and previous cost estimates.@The facilities included steam generation, oil/water separation, water deoiling and reuse and pipelines for diluted bitumen and return diluent to/from a refinery on the Orinoco River.
https://bantrel.com/projects/technical-assistance-for-heavy-oil-study
Kuwait Oil Field Restoration
Bantrel personnel played a key role in supporting Bechtel@s contract to manage the rebuilding of Kuwait@s civilian infrastructure and oil production facilities after the 1991 Persian Gulf War. @The full spectrum of Bantrel@s project management, engineering, procurement and construction management capability/resources was used to fill key roles within the Bechtel organization in Kuwait. @The first Bantrel employee arrived within three months of the end of the fighting, and our work force peaked a
TMEP Lower Mainland Terminal
Bantrel worked on Detailed Engineering services for the TMEP Lower Mainland facilities. The scope included integration of new:Pipelines and tankage expansion of the Burnaby TerminalDelivery pipelines into the Westridge Terminal and expansion of the Westridge Terminal tanker loading facilities and dock complexPiping infrastructure, tank expansion and facilities at the Sumas Terminal
U2 Blowdown Line
DBM and FEED services for of 2 new blowdown headers in Plant 52, along with a new Blowdown Quench Tower, Heavy Slop Oil pumps and strainers. @ Supported by BHTS as licensor support and Coker experts. @ Laser scans of the Coker plant is being integrated with the project 3D model to facilitate determination of tie-in locations, perform clash detections and as-build current infrastructure as needed.
Voyageur Project
Suncor@s Voyageur Upgrader was an oilsands project located in Fort McMurray near the older Suncor Millennium Upgrader site. Once complete, the upgrader was to have a 240,000 barrels per day production capacity. Bantrel was commissioned in 2004 to provide front-end engineering, engineering and procurement services for the Delayed Coker Unit (DCU) and Utilities and Offsites (U @ O) areas. We were later awarded the full engineering, procurement and construction scope for the DCU. The project inclu
Applicant Privacy Notice
Bantrel Applicant Privacy Statement1. INTRODUCTIONThis careers website is operated by and on behalf of Bantrel Co. - including its affiliates, divisions, business units and subsidiaries (@Bantrel@).@ For these purposes, reference to Bantrel includes Bantrel Management Services Co., Bantrel Constructors Co. and Bemac Construction Corp.Bantrel recognizes and respects the privacy of anyone who applies for employment or other engagement with Bantrel (@Applicants@).@We set out below information regar
Pelican Lake Heavy Oil Battery Project
Cenovus has been producing heavy grades of oil in the Pelican Lake region since 1997. Their Pelican Lake assets are located approximately 300 kilometres north of Edmonton. Over the years, a series of new production methods have been applied to the reservoir to enhance oil recovery. Cenovus is currently recovering oil using a proprietary polymer technology which involves adding a polymer to water and injecting the mixture into a well to enhance oil recovery. @Bantrel@s scope of work on the Pelic
https://bantrel.com/projects/pelican-lake-heavy-oil-battery-project
Tailings Booster Station to SPA8
DBM, EDS, Detailed Engineering, Procurement, Expediting, Quality Surveillance and Construction Support @ a fast track project for the conversion of Thin Fine Tailings infrastructure to Regular Tailings service.@ This work included: transient analysis,@ installation of new and modifications to existing@ booster pumps, re-routing of pipelines, installation of new overpressure safety devices and construction of new emergency dump pond. DBM, EDS, EP and Construction Support for a fast track projec
https://bantrel.com/projects/tailings-booster-station-to-spa8
OSB Mill Maintenance
Bemac provided planning support at the OSB mill as directed by Ainsworth. OSB Press Rebuild @ Repair, 100 Mile House, BC. Bemac was retained to complete the replacement of all pins, block bearing assemblies, rod swivel ends, and bearings on a press arm at an OSB (Oriented Standard Board) production facility. @This type of project would typically require a 2-week plant shutdown. With extensive experience in project planning and sequencing, Bemac shortened the turnaround time on this project to 5