The proposed project was to build an LNG export facility on Lelu Island in the district of Port Edward in Northwest B.C. The facility would have shipped 19 million tonnes of liquefied gas to markets in Asia annually.
Bantrel was involved in the FEED and engineering studies for this project.
The project was cancelled in 2017.
Bantrel was involved in the FEED and engineering studies for this project.
The project was cancelled in 2017.
Services Provided
- Engineering