Foster Creek Cogeneration Project

Client

Alberta Energy Company (AEC)

Schedule

2001 - 2002

Industry

Energy

Bantrel's EPCM scope included the design and installation of two GE Frame 6B DLN Gas Turbine Generators with a Once Through Heat Recovery Steam Generator providing 80% quality steam for SAGD operations. 
 

Services Provided

  • Engineering
  • Procurement
  • Construction Management
Back to Top