Suncor Oil Sands, Tailings Area 9

Client

Suncor

Schedule

2016 - 2017

Industry

Energy

Project Included:
  • DBM
  • FEED
  • Detailed Engineering
  • Procurement
  • Estimating
  • Constructability Support

Scope included:
  • Regular Tailings (RT) from Plant 86 is to be pumped to a new tailings pond. From the new pond
  • Thin Fine Tailings (TFT) collected and transferred using TFT barges to pump the TFT to a separate tailings pond
  • High voltage infrastructure was required for the TA9 project to provide power supply to the new TFT barges.
  • A new 72/7.2kV TFT Barge Substation (29EDD-366) and new 8kV trailing cables installed.

Services Provided

  • Engineering
  • Procurement
  • Construction

Completed By

  • Bemac Construction Corp.