Renewed in 2018. EPCM services on a work authorization basis. Projects have varied by facility, scope and phase (Study – Detailed Design) including the Edmonton Refinery and Base Plant operations.

     

Sample projects include:
  • Plant 86 Tailings Booster Station (DBM – DE)
  • CSA Compliance Scoping Study
  • Coke Removal Upgrade (DBM - DE)
  • Debottleneck Evaluation Study
  • Desalter Project (EDS, DE, Construction Support)
  • Plant 38 Boiler FEED Water
  • Honeywell Basic Controller Replacement
  • Mechanical Building and HVAC Scoping Study
  • U1 Coke Drums Top & Bottom (DBM - DE)
  • GO Spray System Reliability Improvement Project
  • Project Millennium Vacuum Unit
  • Optimization Study, Firebag Diluent Options
  • DRU Debottleneck Project
  • Odour Abatement Project - Phase 2
  • Stand-Alone Upgrader Study
Scopes Include: 
  • Suncor Ft. McMurray Slops System Upgrade
  • Suncor Ft. McMurray South Tank Farm Vapour Recovery 
  • Suncor Ft. McMurray South Tank Farm Dewatering 
  • Suncor Ft. McMurray Expansion Studies
  • Suncor Ft. McMurray Upgrading Expansion Study Phase II
  • Suncor Ft. McMurray Debottleneck Detailed Engineering
  • Suncor Ft. McMurray Firebag SAGD Lease Studies
  • Blending Facilities Detail Design Project
  • Suncor Edmonton Refinery
  • C4 Recovery Process Study
 

Services Provided

  • Engineering
  • Procurement
  • Construction Management