Millennium Naphtha Unit Project

Client

Suncor

Schedule

2005 - 2009

Industry

Energy

In 2005, Bantrel was contracted to provide engineering and procurement services for Suncor’s Millennium Naphtha Unit (MNU) Project.

Bantrel’s scope of work included engineering and procurement services for a new 28,800 BPSD naphtha hydrotreater, plus associated utilities and offsites (U & O), to interface with a new hydrogen plant. Using a multi-office execution strategy, Bantrel executed the MNU Project from both our Calgary and Edmonton offices. 

The U & O scope included a boiler feed water treatment facility and additional instrument air capacity.

Throughout the project, Bantrel purchased more than $92 million of material and equipment.

EP services for 8,800 BPSD naphtha hydrotreater, plus associated utilities and offsites (U & O), to interface with a new hydrogen plant including:
  • a boiler feed water treatment facility interconnecting wiring
  • additional instrument air capacity
  • new butane storage sphere, a new substation and remote instrument building, a new cooling water booster pumphouse, interconnecting piping on new and existing racks, and interconnecting wiring
  • new substation and remote instrument building
  • new cooling water booster pumphouse
  • interconnecting piping on new and existing racks
  • interconnecting wiring

Services Provided

  • Engineering
  • Procurement