Coker Fractionator Replacement

Client

Suncor

Schedule

1999 - 2005

Industry

Energy

EPCM services were provided by Bantrel to replace the existing 5C-9 fractionator tower with a new tower with a run length of 5 years including:

 

  • New fractionator tower
  • New modularized pipe bridge to connect the new fractionator with the base plant
  • Equipment associate with  additional pumping capacity and coke filtration
  • Piping systems to/from the new plant and tie-ins to the existing base plant
  • Electrical and instrumentation

Services Provided

  • Engineering
  • Procurement
  • Construction Management