Base Plant, Plant 86 Tailing Booster

  • Home
  • Projects
  • Base Plant Project, Plant 86 Tailings Booster Station to SPA8

Client

Suncor

Schedule

2014 - 2016

Industry

Oil, Gas & Chemicals

DBM, EDS, Detailed Engineering, Procurement, Expediting, Quality Surveillance and Construction Support – a fast track project for the conversion of Thin Fine Tailings infrastructure to Regular Tailings service. 

This work included: transient analysis,  installation of new and modifications to existing  booster pumps, re-routing of pipelines, installation of new overpressure safety devices and construction of new emergency dump pond.

DBM, EDS, EP and Construction Support for a fast track project for the conversion of Thin Fine Tailings infrastructure to Regular Tailings service including:
• Transient analysis
• Installation of new and modifications to existing booster pumps
• Re-routing of pipelines
• Installation of new overpressure safety devices
• Construction of new emergency dump pond
 
 

Services Provided

  • Engineering
  • Procurement
  • Constructability Support

Completed By

  • Bantrel Co.
Back to Top